
Globlue Technologies LLC
UX/UI Design
2025 - Present
I'm Maria, a solid UX/UI Designer on the way to becoming great. Designing everything from battery interfaces to digital products has taught me that every problem demands a different way of thinking. Maybe that's why I love design so much.







UX/UI Design
2025 - Present

UX/UI Design
2024 - 2025

UX/UI Design
2023-2024
Design has taught me there's always a better way to solve the same problem. Studying is what expands my ability to find the best ones.